211112_NSSC Held the 149th Meeting of the Commission.pdf미리보기 List Previous [November 19, 2021] NSSC Approved Criticality of Kori Unit 3 During Periodic Inspection and to Conduct Power Asce nsion and Other Remaining Tests Next [November 11, 2021] NSSC Said Shinkori Unit 1 Was Manually Shut Down and to Be Repaired